Delivered project · 2021

Niğde: wells, pumping station and reservoirs in one system

At Niğde Municipality, field modernisation and remote management cut monthly electricity consumption by 36% for transferring 800 m³ of water an hour.

Pumping station in Niğde after rehabilitation: new blue pump sets and neatly arranged pipework

Niğde: the same water, 36% less electricity

For 800 m³ of water transferred an hour, monthly electricity consumption fell from 1,000,000 kWh to 640,000 kWh.

reduction in monthly electricity consumption for the same volume of water in Niğde
36%
submersible pump stations
46
distribution reservoirs
9
year operation began
2021

Niğde Municipality project, operated long term under a savings-sharing model. The result depends on the condition of the system and the scope of work.

The same pumping station, before and after rehabilitation

Pump and motor sets were renewed and the valves and pipework rearranged. Panels and automation were installed and the station was connected to central monitoring.

Pump operation is adjusted to level, flow and pressure requirements. Energy consumption is assessed together with the volume of water transferred.

See all projects
Pumping station before rehabilitation: old pumps and untidy pipework
Before
Pumping station after rehabilitation: new blue pump sets and neatly arranged pipework
After

Three layers from measurement to the control room

In the Niğde Municipality project, the modernisation of the well facilities, the pumping station and the water reservoirs was tackled together.

  • Field measurementWater transfer and electricity consumption were compared before and after the upgrade. Today EWA carries out this step with Aqua Guide.
  • Field control with MetiriusPumps and reservoirs were placed under local automation.
  • Central monitoringWells and reservoirs were brought together on the same monitoring and control infrastructure, and the facilities are monitored from the control room. Today EWA delivers this layer with Predixi WIS.
Two operators in the Niğde control room following plant status on the wall displays

Scope

In the Niğde Municipality project, 46 submersible pump stations, a pumping station with three pump and motor sets, and 9 water distribution reservoirs were modernised. The project documents show that operation began in 2021.

Metirius field control and a central management system connected the local equipment to remote monitoring, management and reporting. Wells and reservoirs were brought together on the same monitoring and control infrastructure.

Operating model

The project combined investment and operating responsibility under a partnership model focused on energy efficiency. Based on savings sharing, the model also covers maintenance, repair and performance tracking after implementation; following the initial modernisation investment, the project continues with long-term efficiency management.

Measured result and conditions of application

This project shows an approach that addresses equipment, control and operation together. The energy result above is project data shared by the company. The scope and performance targets for new plants are set from their own field measurements.