Niğde: wells, pumping station and reservoirs in one system
At Niğde Municipality, field modernisation and remote management cut monthly electricity consumption by 36% for transferring 800 m³ of water an hour.
Delivered project · 2021
At Niğde Municipality, field modernisation and remote management cut monthly electricity consumption by 36% for transferring 800 m³ of water an hour.

For 800 m³ of water transferred an hour, monthly electricity consumption fell from 1,000,000 kWh to 640,000 kWh.
Niğde Municipality project, operated long term under a savings-sharing model. The result depends on the condition of the system and the scope of work.
Pump and motor sets were renewed and the valves and pipework rearranged. Panels and automation were installed and the station was connected to central monitoring.
Pump operation is adjusted to level, flow and pressure requirements. Energy consumption is assessed together with the volume of water transferred.
See all projects

In the Niğde Municipality project, the modernisation of the well facilities, the pumping station and the water reservoirs was tackled together.

In the Niğde Municipality project, 46 submersible pump stations, a pumping station with three pump and motor sets, and 9 water distribution reservoirs were modernised. The project documents show that operation began in 2021.
Metirius field control and a central management system connected the local equipment to remote monitoring, management and reporting. Wells and reservoirs were brought together on the same monitoring and control infrastructure.
The project combined investment and operating responsibility under a partnership model focused on energy efficiency. Based on savings sharing, the model also covers maintenance, repair and performance tracking after implementation; following the initial modernisation investment, the project continues with long-term efficiency management.
This project shows an approach that addresses equipment, control and operation together. The energy result above is project data shared by the company. The scope and performance targets for new plants are set from their own field measurements.